Skip to main content

Pallet racking in Port Talbot, built for coil, long steel and the steelworks supply chain.

Port Talbot stores heavier things than most towns in Wales. Hot rolled coil leaves the strip mill, imported slab arrives through the deep water harbour, and the units at Kenfig, Baglan and Harbourside hold everything from refractory spares to wind turbine fixings. Standard pallet racking is only part of the answer here.

We are 30 minutes away at Seven Sisters, down the Dulais valley and along the M4 to junctions 41, 40 and 38. We design coil cradles, heavy duty and drive-in racking, inspect it to SEMA codes of practice, and repair it when a loader or reach truck gets it wrong.

Drive from Seven Sisters
30 min
Distance
18 miles
Survey lead time
Within 5 working days
Typical install
4 to 8 weeks

Port Talbot warehouses sit between a steelworks, a deep water harbour and the M4.

The steelworks dominates the coastal strip from Margam to Aberavon. Tata Steel stopped making iron here in 2024 and is building a £1.25bn electric arc furnace due to melt UK scrap from around the end of 2027. During the changeover the hot strip mill has kept rolling imported slab, so coil, plate and finished strip still move out by road and rail every day. That traffic feeds stockholders, service centres, engineering contractors and haulage yards across the borough, and their storage is sized for weight per level, not pallet count.

To the west, Baglan Energy Park is a 180 acre site on the former Baglan Bay chemicals works beside junction 41, home to the Bay Technology Centre and a mix of manufacturing and distribution units. Kenfig Industrial Estate at Margam, off junction 38, holds large sheds used for regional parcels, catering supply and auction stock. Harbourside, between the town centre and the docks, is becoming an innovation district around the SWITCH steel research facility.

The docks themselves are about to change too. Associated British Ports plans to turn Port Talbot into the first Celtic Sea port for floating offshore wind, which will bring fabrication, marshalling and spares storage to the waterfront and to suppliers further inland.

  • Baglan Energy Park, J41

    Mixed manufacturing, energy and research units; components, consumables and lab stock on adjustable racking and shelving.

  • Baglan Industrial Estate

    Smaller engineering and trade units storing fabricated steel, bar and tube, often on cantilever racking.

  • Kenfig Industrial Estate, Margam, J38

    Large distribution and wholesale sheds running high bay pallet racking and multi-shift reach truck fleets.

  • Port Talbot Docks and Harbourside

    Bulk and project cargo, offshore wind supply chain space, and the SWITCH steel research building.

  • Steelworks supply chain around Margam and Taibach

    Coil, plate, rolls, refractories and mill spares held by contractors and stockholders serving the works.

Racking and storage we install most in Port Talbot.

Ordered by what Port Talbot sites ask us for. Heavy steel storage comes first because that is what the town handles, followed by the pallet systems used in the Kenfig and Baglan distribution sheds.

Racking safety duties for Port Talbot steel and logistics sites.

Under PUWER 1998 your racking is work equipment, and HSG76 expects an appointed person responsible for racking safety, recorded visual checks by trained staff, and an expert inspection at least every 12 months by a SEMA Approved Rack Inspector. On a steelworks contractor site that appointed person often sits within a permit to work regime, so we fit our inspection around your isolations, crane lockouts and the contractor induction you already run.

Heavy loads change the risk. A single coil or roll set down hard can do more damage to a cradle or beam than months of light pallet traffic, and wear in a 24 hour, four shift rota is spread across crews who may not report it. We grade every defect red, amber or green, show you where repeat impacts come from, and train your staff to carry out weekly checks with a simple log. That record is what your insurer and any HSE visit will ask to see.

Storage for the Port Talbot steel transition and offshore wind.

Port Talbot is mid way through the largest change in its industrial history. Ironmaking stopped in September 2024, the hot strip mill continues to roll imported slab, and the new electric arc furnace will recycle around 2 to 2.5 million tonnes of UK scrap a year once commissioned. Each stage moves stock around. Coil is bought in, buffered and shipped on. Contractors on the furnace build need laydown and stores for fixings, cable and steel components. Stockholders are reorganising to serve a works that will melt scrap rather than ore.

At the same time, Associated British Ports has secured up to £64m of government support towards a floating offshore wind hub at the harbour, part of a wider plan inside the Celtic Freeport. That brings a second wave of heavy, long and awkward items to store. Our job is to give these sites racking that matches the load: cradles for coil, cantilever for long steel, heavy duty decked racking for spares, and drive-in for repetitive bulk lines.

Coil cradles sized per coil

Cradle width and pocket spacing set from your coil widths and outside diameters, with floor loading confirmed before installation.

Contractor stores for the furnace build

Short lead adjustable racking, longspan shelving and mesh cages for project stores, with relocation or buy-back when the build ends.

Offshore wind supply chain space

Cantilever and heavy duty racking for flanges, bolting sets, chain and mooring spares as the harbour hub develops.

Inspection around shutdown windows

Inspections and repairs booked into planned outages and weekend crane maintenance, so production days stay clear.

Getting to Port Talbot from Seven Sisters.

Our route is the A4109 down the Dulais valley to Aberdulais, the A465 to junction 43, then the M4 east. Baglan Energy Park at junction 41 is about 25 minutes from our yard, the town centre and docks at junction 40 around 30 minutes, and Kenfig Industrial Estate at junction 38 about 35 minutes. Traffic through the 50mph limit across the Port Talbot viaduct is the main variable, so our install crews arrive before the morning peak.

Surveys are usually booked within five working days. Installs are phased around your shifts: on multi-shift steel and distribution sites we often work nights or weekends so the forklift fleet keeps running. Annual inspections can be split across several visits for large Kenfig sheds, and urgent damage calls from Port Talbot sites are prioritised in our diary.

Baglan Energy Park, J41
25 min
Town centre and docks, J40
30 min
Kenfig Industrial Estate, J38
35 min
Urgent damage calls
Prioritised

A Port Talbot project: drive-in and wide aisle racking together.

Our Port Talbot case study is a distribution warehouse where a handful of products made up most of the pallets, yet everything sat one deep in wide aisle racking. We built a drive-in block for the high volume lines and kept adjustable pallet racking for the mixed lines, so the existing counterbalance fleet still worked. Pallet positions rose from 1,180 to 1,870, and the work was phased over three weekends.

That pattern is common here. Sites around Margam and Baglan tend to carry a few heavy, repetitive lines alongside many smaller ones. A typical job starts with your stock profile rather than the floor plan: we count lines, pallets per line and pick frequency, then split the building between dense storage and selective racking. Drive-in lane entries get protection from day one, because trucks entering lanes cause most of the impact damage we repair.

Wide aisle pallet racking with a counterbalance forklift

Questions from Port Talbot.

Yes. We design floor mounted coil cradles and coil racking for stockholders and service centres handling strip mill product. We need your coil widths, outside and inside diameters, weights and how you lift them, whether by overhead crane with a C-hook, coil ram or forklift. From that we set pocket spacing and cradle length, then check the floor slab can take the point loads. Typical supply and install is 4 to 8 weeks from order, and we can run the job around crane maintenance so coil handling is not stopped.

Yes. Project stores on the Port Talbot furnace build usually need adjustable pallet racking for palletised fixings and cable drums, longspan shelving at about 200, 400 or 800kg per level for small parts, and mesh partitions for a lockable cage. We can install within days if stock components suit your layout. When the project closes we dismantle, relocate it to your next site, or buy the racking back, which keeps the cost of a two or three year stores low.

We agree a plan with your appointed person before the visit. On a continuous site we inspect aisle by aisle, closing one at a time for 30 to 60 minutes, or attend overnight when traffic is lightest. Every defect is tagged on the rack and graded red, amber or green in a written report the same week. Red items are offloaded immediately. For larger Kenfig sheds we often split the inspection over two or three visits so no shift loses access to more than a few aisles.

Flanges and mooring chain are heavy and irregular, so we normally use heavy duty pallet racking with steel decking for flanges and palletised bolting sets, and cantilever racking for chain, wire and long fabrications. Aisle widths depend on your trucks: 3.5 to 4.2m for counterbalance, 2.7 to 3.2m for reach trucks. As the Port Talbot harbour hub grows, suppliers often start with a small run and add bays, so we design for extension from the first survey.

Usually, yes. We set column spacing from the length and stiffness of your longest bar so it does not sag between arms, and arm length from your bundle widths. Single sided runs against a wall save floor in narrow Baglan units, while double sided runs suit a central bay with sideloader access on both faces. We can survey within 5 working days, measuring roof height, column grid and door positions, because loading 12 metre steel through a standard roller door is often the real constraint. Supply and install is typically 4 to 8 weeks from order.

Yes. Most Port Talbot repairs are on uprights struck by forklifts or loaders, and we replace them with matching components or approved repair kits. We are about 30 minutes away via the M4 to junction 40, so a red risk bay is offloaded and isolated first, then repaired at night, at weekends or during a planned shutdown. Amber items are scheduled within the period your inspection report sets. Many common uprights and beams are held in stock, so most repairs take one visit, two at most where a non standard part is ordered. After the work we update your inspection record so the bay is formally back in use.

It depends on how many pallets you hold per product. In our Port Talbot case study, moving the bulk lines into drive-in lanes and keeping wide aisle racking for mixed lines took the site from 1,180 to 1,870 pallet positions and recovered 27% of the floor. Drive-in works best with at least 10 to 20 pallets per product and last in, first out rotation. Lines with only one or two pallets each should stay in selective racking.

Other towns we cover near Port Talbot.

From Port Talbot the M4 runs east to Bridgend's industrial estates and west to Swansea's docks and enterprise parks, with Llanelli's steel and tinplate works just beyond, while Neath sits on our route home. Many steel stockholders and contractors operate across all four, so one survey can cover several sites.

Plan coil, heavy duty or drive-in racking for your Port Talbot site.

Send us your load data or stock profile and we will visit within five working days, measure the building and come back with a layout. Book a free site survey or book an inspection.